Refine your search:     
Report No.
 - 
Search Results: Records 1-1 displayed on this page of 1
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Introducing an 8-GeV booster synchrotron between RCS and MR at J-PARC; One possible option toward a multi-MW output beam power from MR

Hotchi, Hideaki; Harada, Hiroyuki; Yamamoto, Masanobu; Igarashi, Susumu*; Koseki, Tadashi*; Sato, Yoichi*

JPS Conference Proceedings (Internet), 8, p.012008_1 - 012008_6, 2015/09

Now the J-PARC accelerators (Linac, 3GeV RCS, 50GeV MR) are in transition from the initial beam commissioning phase to the final stage aiming for the design output beam power of 1 MW from RCS and 0.75 MW from MR; RCS is to start 1-MW beam tuning from October 2014 after completing the linac upgrade, and MR aims at 0.75 MW within the next 3 years by introducing new main magnet power supplies with the faster cycling time. In view of such current situation, we have started discussions for the future J-PARC accelerator concept toward a Multi-MW output beam power. In this paper, we discuss the feasibility for the introduction of a new 8-GeV booster synchrotron between RCS and MR as one possible option toward a Multi-MW output beam power from MR, in combination with the RCS beam power upgrade from 1 MW to 2 MW.

1 (Records 1-1 displayed on this page)
  • 1